After weeks of preparation and waiting for materials to be delivered we sent our team down to Tsabong on Tuesday with a first-fix of goods. A final delivery of R70,000 worth of PVC pipes and fittings arrived on Friday and was transhipped to a local transporter together with the remainder of the reverse osmosis membranes and a few tons of Grundfos pumps on Friday.